Monday, May 10, 2010

Paint Job and Unpacking the Telescope

This is how it sat for the past 2 weeks of bad weather, which included snow! I did my best to keep it dry so at the first break in the sky I could paint.
Inside the shop I did some work on the dome, mounting ring and wheel kit, it now rotates smoothly and is ready for final installation after painting.


Also unpacked the scope because I needed some measurements from the unit to continue with pier building. It's fun to see it out of the box and nice getting it mounted to the tripod without dropping it.

How's this for a lens?


Finally I caught the break I've been waiting for, it was sunny and mid to upper 50's so the paint went on both inside and out.
The color is Canton Jade, I like it.
I hope to put together a crew this week to install the dome on top of the building, so the weather is no longer a problem.

Monday, April 19, 2010

Round Dome Square Building

Today it was time for the roof and ring test fit. I was pleased, everything centered up well so I left them to soak up some sun, soften and relax.

Inside view of the ring fit.

Sunday, April 18, 2010

Up go the Walls

Friday I spent some time working on the rotation ring and wheel kit, which are both supplied with the dome. So far the parts have been well labeled and complete with easy to follow instructions.
This sure was the right time to start test fitting the ring to the roof because in a few days it will be over my head. I also pulled the dome into the shop to install a wheel ring that attaches to the under side, and yes, I did get inside! Sitting on a cooler I worked the shutter doors and got a little feel for what it's going to be like, VERY COOL.
Today was a big day.
Dean and Lester showed up ready to work and first on the list was getting the dome out of the building where we only had 1/2 inch total door gap, which is the reason the walls could not go on until it was outside.
After shoe-horning it out of the building, the walls went up fast, putting up three sides we then lifted and slid the roof section in place, finishing up with the last wall.

Rough door opening.

Roof panel detail

A special thanks to Dean and Lester, who are very good friends and continue to be very helpful on this project, Jim and I both appreciate it.

Thursday, April 15, 2010

Pier Building Day

I took advantage of some open shop time at my friend Tom Christiansen's art studio in Lutsen called Last Chance Fabricating. In his shop is a tool called a plasma cutter that makes a 1/2 steel plate cut like butter. Every time I use this tool the WOW factor sets in because it makes cutting steel almost painless.
This is the layout of the base ring on the 1/2 inch thick steel plate. It's 14" in diameter with a slotted 3 hole pattern that will allow about 18 degrees of adjustment for aligning the pier to true North.

After cutting the base out I drilled a series of 3/4 inch holes, 3 per slot, 9 in total and then I used the plasma cutter to remove the web in between the holes to form the slots.
The base plate was then welded to the 8" pipe making sure that it was centered and square. Then three 30 inch long gussets were cut out and added for support of both the pipe and base plate.


I left the pier longer for now, it will get cut down after we do some measuring. I still have some grinding, sandblasting and painting to do along with building the equatorial wedge.
Tomorrow I hope to put a crew together for some heavy lifting, if it goes well the observatory will be mostly assembled and ready for paint.

Thursday, April 08, 2010

Dome Home

Well after 15 hours and 630 miles the dome is home.
Dean lent us the trailer and Lester did the ride along. It started at 6:00 am in Lutsen and then, 6 hours later we arrived at Polydome. While visiting with Dan, we got some great tips on making the rest of the assembly go smoothly, we then packed up, strapped down and took off around 1:30. Our first stop was at an auto store for trailer wiring supplies and door mirror extensions. The dome was bigger then I had expected and was very hard to see around, add a 20 mph head wind and we had all the makings for a long drive home. It ended at 9:00 pm when we drove into Lutsen.


I can't say enough about Dan at Polydome he was helpful and gave us a very fair deal on a great made in Minnesota product. I'm excited to start installing it next week.

Monday, April 05, 2010

Walls and Roof

Framed up the wall and test fitted them.


After that they were laid down on the floor one at a time to glue and screw the siding on.


Then stacked on the trailer so I can move them outside. My garage doors are too small to complete the building inside.


And next,the start of the roof layout.

Tuesday, March 30, 2010

Building at last

The last few weeks has been spent gathering supplies and now with another break in the weather the building has begun. I now have all the materials to build the steel pier and all the wood for the observatory.

Here is the floor layout



Complete floor on wheels for easy moving around the shop



Steel for the pier


All the wall and roof parts cut and ready to go. Won't take long to assemble it now.

Thursday, March 18, 2010

Nice weather at last

Weather during the first few weeks of March was quite a messy mix, warmer then usual with a lot of rain cutting into the deep snow cover and starting to pull frost out of the ground. I was down in the cities for the first week, did some shopping, mostly observatory stuff with some snowmobile parts added in for good measure. Picked up all the steel for the telescope pier, found some red lights and caster wheels at Ax-Man (for those of you who don't know Ax-Man, I'm sorry, you're really missing out. I also gathered screws, glues and all the little crap that up here is a 30 mile round trip if you forget something.

The trip back into the cabin involved snowmobiling over very wet snow, which for me was no big deal, but I brought the boys along and they're no big fans of this mode of travel! And after arriving, all they did was bellow about my audacity in putting my astronomy books all over their favor spot.


So after some clean up, there was peace in the house and we could get down to work

Yesterday I had a very helpful breakfast meeting in downtown Lutsen with the world renowned land surveyor, Samuel Parker and his wonderful and beautiful wife Diane. Sam's research team had assembled a packet of information including maps and GPS marks that will enable us to define the observatory site. Sam took the time to make sure I understood all that was in front of me, and he also explained a sun shot procedure for determining true north. I'm hoping he'll come out and demonstrate this when we set the pier.

After breakfast it was a trip to the lumber yard for a trailer load of wood to start the observatory. Back at the shop I cut everything out for the floor following the plans from Polydome. Assembly will be tomorrow.