Woke to 2 more inches of very wet snow. (Lucky us!)
Here is the view at the top of the driveway looking down the road.
So up to the warm room for some more indoor work on the ABC jumbo blocks.
we reinstalled them on the temporary post so Pat could lay out the images on the open faces of the blocks.
We then pulled it back a part and started the decoupage.
We have applied 2 of 6 coats of glue over the art which will then get a final coat of poly.
Really nice blocks, can't wait to see the building this summer when I can finally drive in instead of hiking through a mile of mud.
ReplyDelete