Wow, it's been crazy around here
starting with two trips to the cities to get my knee surgery set up.
Mike and Joline brought the grand kids up north
for a short get away that included lots of camp fires, fishing, 4 wheeling and fun
so again the observatory took a back seat.
But then Dean showed up,
anyone who has hired Berneking knows that when he's done you're Happy.
We had a list,
"The Dean's List"
and 1st thing was to set hun's propane tank cover in place
It was nice to move it over to it's permanent home.
We built it in the driveway and it was somewhat in the way.
The big dig began at the electric meter.
Years ago when running water and power to our cabin we back filled this part of the ditch with sand and a marker post knowing we would have to re-dig in the future.

This ditch is 6 foot deep and running up our driveway, the depth was needed for the water line.
this hole has propane line, water curb stop, 2 water lines, 3 eclectic lines, 2 empty conduits.
we had some lager boulders on site that Dean pulled out and placed to build the corner of Pat's large terraced rock garden.
Now came the landscaping around the warm room.

this allowed for a wider, level path around the building and more planting space.
(it's level, bad photo)
Pat and I also installed the steel roof on the warm room, we just need to trim it out and I'll put a photo in next time.