Sunday, May 01, 2011

Indoor Work Weather Spent Painting

Rain, windy and cold.
We did get a short break in the weather to set up our 1st fence layout.

Once happy with the layout the fence was removed as one panel, taken inside and painted. The long corner post will be shortened when we decide how they're going to be topped.

Once this 2nd coat is dry we are going to glue 1" yellow smiley face marbles in the top holes.

Here is one we just pushed into the wet paint to get a feel of how it will look.

Also painted the inside of the door.

No comments:

Post a Comment